Permitting (PPC) support takes the form of assisting clients with the characterisation of their hazardous chemical and waste storage, transfer, use and generation on-site, focussing on containment and control. These are reported to the regulatory authority in the form of an Application Site Report [ASR], followed by a recommended Site Protection & Monitoring Programme [SPMP]. There may be a need to collect initial reference data designed to establish a baseline site condition with respect to contamination of soil and groundwater, as part of the improvement programme embedded in the PPC Permit, or undertake ongoing monitoring. In the case of site closures there will be a need to collect a repeat set of data to compare with the original baseline. |
|
|